02-01-2019, 09:12 AM
Nice. I was trying to picture the look on my wife's face as we pumped high pressure fluid splashing into a bucket next to the bed.
So HWH tells me that the RAP90931 is obsolete and the replacement is an RAP93782.
Bad news is that they have no stock and it take a minimum of 4-5 weeks to build one.
I'll have to check with Newell on Monday to see if they have any in stock.
So HWH tells me that the RAP90931 is obsolete and the replacement is an RAP93782.
Bad news is that they have no stock and it take a minimum of 4-5 weeks to build one.
I'll have to check with Newell on Monday to see if they have any in stock.
Paul
Coach #540
2000 Double Slide, Bath and a half, Average sized fan for its age
Fulltiming for a while around CO