You are not logged in or registered. Please login or register to use the full functionality of this board...


monday april 3rd hwh slide seal party in wittmann
#7

Jack I attempted a fix of this last year. I think there is a post of that.

The side wall of the coach at the top of the hole for the slide box has a length of 1.5"X1.5" .062 wall tube steel that is there to stiffen the wall at the opening and as a place to weld the slide pin mount to. A lot of force moving through some light weight material.

https://share.icloud.com/photos/0ea2bk9V...o9yQsZO6CQ
https://share.icloud.com/photos/0a4rk925...UT_ByIdKeg

1998 Coach 484
1997 Suzuki Sidekick toad. 
Cheers.  
 
Reply


Messages In This Thread

Forum Jump:


Users browsing this thread: 1 Guest(s)