01-29-2024, 11:56 AM
(01-22-2024, 07:41 PM)Newell 1984 Wrote: Yes we designed fab and installed 4500 watts tracking system with 6k inverter transfer to balance ea leg. 2kwh + LP 48 volt batteries
Yes we designed fab and installed 4500 watts tracking system with 6k inverter transfer to balance ea leg. 2kwh + LP 48 volt batteries
I would love to have something like that fabricated for my coach. I think it would all be too tall for the newer coaches like mine though. Can you estimate what that solar set up cost to build and install?
Dave, Karen, w/Buddy and Moose.
06' Newell #784
towing a 05' Featherlight enclosed trailer for toys and tools,
or a 21' F350 w KTM 300, and MTB in the back
35' Packard 4 dr convertible
59' Nash Metropolitan
+ 4 more cars and 8 motorcycles
Carpe Diem. Have Fun
Tomorrow is not guaranteed.