02-29-2016, 09:47 PM
day 1 of floor being done.
he spent the door grinding the floor. he had a humongo floor grinder with 200 lbs of weights on it. he used 3 different grits. took him all day.
tomorrow is fixing the divets and cracks and more cleaning.
looks great so far.
place looks bigger with nothing in it.
tom
he spent the door grinding the floor. he had a humongo floor grinder with 200 lbs of weights on it. he used 3 different grits. took him all day.
tomorrow is fixing the divets and cracks and more cleaning.
looks great so far.
place looks bigger with nothing in it.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH