09-21-2015, 07:18 AM
I am online with SD now and sure enough, they lied, they don't have those airbags, 6-8 weeks to build them... I will figure out today which airbags I need and get extras to carry with me since the bags on the coach look decent but not sure they were ever changed... This would be very disconcerting if I had one blow, ordered and then was told I had to wait 2 months for the bag... maybe we should buy a bunch and keep them somewhere and ship them out when needed... tires too! I've thought about why someone has not launched a website like SD but for our wierd, always out of stock tires...
Karen & Adrian Abshire
1998 2 slide 45' Newell Coach 498
Prior: 1985 Foretravel ORED 35, 1988 38' Foretravel U280, 2000 Foretravel 42' U320, 1990 Bluebird Wanderlodge WB40