11-20-2018, 02:11 PM
i had a long chat with mark at newell today about the process for doing the slide seal. he said he can do one complete from start to end in about 6-7 hours....i will see how many times that it is for me....ha
it does take two guys to take the slide out. my neighbor is helping with that.
and 6 to put it back in.....2 on the inside and 4 on the outside pushing the slide back into place. so i will have to plan that part.
i will take lots of pictures. should be fun
tom
it does take two guys to take the slide out. my neighbor is helping with that.
and 6 to put it back in.....2 on the inside and 4 on the outside pushing the slide back into place. so i will have to plan that part.
i will take lots of pictures. should be fun
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH