11-04-2021, 04:22 PM
So I had a postponed job on Monday and Tuesday. Being thrown a monkey wrench into my schedule I had to quickly find a place for my guys. So I had them come to my place to install a 50 amp circuit for the Newell. I used my little bobcat with trencher to dig the exterior portion to make it a little easier for the guys. I have a sub panel in the garage which is 130' away from the final point. They had to cut up some drywall in a sitting room behind the master bedroom and Marie's closet. Overall not too bad. My drywall guy is coming tomorrow and if he had been busy, I would have patched it up myself. I have smooth textured walls which make any repairs easy. Matching the paint, well that's another story! It turned out great overall. I also put a Cat5 line and a water spigot there too. I dropped the coach off at a suspension shop to give it a lookover as it has a thumping sound when going over small bumps.
My bird Coco sat with me during the final connections! (We raise Classic Old Frills Satinette Pigeons)
My bird Coco sat with me during the final connections! (We raise Classic Old Frills Satinette Pigeons)
--Simon
1993 8v92TA #312