progress report.....
after a ton of work and time, the plans were submitted for permits on 3/25. builder says to expect up to 3 weeks for permits.
it was like building a house as far as plans, surveying, engineering, placement of electrical etc.
next is to get the septic permits....
i cant wait till i can actually post pictures rather than words.
tom
after a ton of work and time, the plans were submitted for permits on 3/25. builder says to expect up to 3 weeks for permits.
it was like building a house as far as plans, surveying, engineering, placement of electrical etc.
next is to get the septic permits....
i cant wait till i can actually post pictures rather than words.