06-20-2014, 07:27 PM
Update on my Shop,
after 5 months of drawing, engineering, surveying and the last 3 months of permitting, today i got my building permit to start construction.
i never expected it would take 3 months to get the permit.
next week they should start building up the pad. they have to raise it up about 18" or so. thats a lot of dirt.
it almost seems surreal after waiting so long and talking about it so much.
i keep trying to imagine how it will really look and it will be fun to see if what i have seen in my mind for so long is what it really looks like.
if people are interested, i will put updates and pictures as construction progresses.
i am feeling a bit lowly as you all are gathering in table rock. sure wishing we could have made it.
tom
after 5 months of drawing, engineering, surveying and the last 3 months of permitting, today i got my building permit to start construction.
i never expected it would take 3 months to get the permit.
next week they should start building up the pad. they have to raise it up about 18" or so. thats a lot of dirt.
it almost seems surreal after waiting so long and talking about it so much.
i keep trying to imagine how it will really look and it will be fun to see if what i have seen in my mind for so long is what it really looks like.
if people are interested, i will put updates and pictures as construction progresses.
i am feeling a bit lowly as you all are gathering in table rock. sure wishing we could have made it.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

