07-03-2014, 10:36 AM
This was just one of the outstanding seminars presented at the rally! I have been very interested in having this feature installed on my coach. Richard's instructions were clear & the new set up installed almost as he stated. I say almost because he indicated installation should take about an hour. Not much gets done at my house in an hour, so it took 2 1/2 hrs. Richard's tip to drop both the original on/off switch AND the hi/low switch was spot on. I found a little used ground post on the side of the steering column that I was able to connect the ground to.
Thank you Richard for your design, documentation & presentation at the rally!!!!!





Thank you Richard for your design, documentation & presentation at the rally!!!!!







Steve Bare
1999 Newell 2 slide #531