07-08-2014, 07:37 PM
status update. after finally getting the permit, the builder has been tied up with the heavy equipment needed to do my pad. right now i am in dirt shock. the engineer is saying i need 410 cubic yards of dirt to build the pad up. since i live in the boonies, that is going to cost me a small fortune. the builder is searching for that much dirt. i also have a friend who is an exec with a huge pool builder and he is seeing if he can find me any dirt from pool digging.
all of that aside, the dirt starts coming monday. he said it will be trucks coming and going for 4-5 days bringing the dirt.
i have to build the pad up about 2 feet due to floodplain requirements.
tom
all of that aside, the dirt starts coming monday. he said it will be trucks coming and going for 4-5 days bringing the dirt.
i have to build the pad up about 2 feet due to floodplain requirements.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60