05-10-2013, 06:35 AM
when i did some on my 90 i only needed to do the top layer. an it didnt really matter where you cut it out because you could just make new furring strips along the edge of where you cut it.
it had a 2" floor. started with 1/2" plywood base, then furring strips that were 1" high made of 2 pieces of 1/2" plywood and then a 1/2" plywood on top. in the spaces between the furring strips was 1" foam insulation.
tom
it had a 2" floor. started with 1/2" plywood base, then furring strips that were 1" high made of 2 pieces of 1/2" plywood and then a 1/2" plywood on top. in the spaces between the furring strips was 1" foam insulation.
tom
2014 Haulmark 40' Super C on Freightliner Cascadia ISX15 Easton 13 speed
Former Owner 1990 38' Newell Coach 236 8V92
Former Owner 1999 45'8" Newell Coach 526 Series 60
Former Owner 2002 45'8" Newell Coach 608 Series 60

