(01-22-2024, 07:41 PM)Newell 1984 Wrote: Yes we designed fab and installed 4500 watts tracking system with 6k inverter transfer to balance ea leg. 2kwh + LP 48 volt batteries
Yes we designed fab and installed 4500 watts tracking system with 6k inverter transfer to balance ea leg. 2kwh + LP 48 volt batteries
I would love to have something like that fabricated for my coach. I think it would all be too tall for the newer coaches like mine though. Can you estimate what that solar set up cost to build and install?