12-25-2022, 01:45 PM
Making headway in the leak department, at the 24 hour mark there is still 118 PSI in the system The slide seal repair is holding and I cleaned the seat on a solenoid operated valve beside the Thomas Compressors. I think there's a tiny leakage through the pocket door valves, I'll get some on order ASAP. Then it's on to the main air tanks.
Jim
2014 Newell Coach 1482 Mid Entry 45'8" Valid Slides and Valid Levelling