Newell Gurus

Full Version: Newell House
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
That is a very pretty floor Tom. Will have to stop by next year to see it.
Been working on the kitchen in the mancave.  a buddy came over this week and we spent a 15 hour day getting 90% of it done.  my buddy is very good at it and i was his grunt.  he is coming back over monday and we will finish it.  have been getting bids on granite and will settle on it in a few days.  

the on demand hot water heater from TruTankless I mounted today.  and cut some more of the drawers out for the toolbox sink.  

moving along but still slow.  

tom
Great progress. The mancave is really coming together.
Seems weird to ser stuff in there after all this time!
this week there has been alot of progress on the shop.  

....got the mancave aircon up and running.  i got a 18 seer variable speed air handler and variable speed outside heatpump.  very very quiet.  cant even hear the air handler running when right next to it.  i was paranoid about duct noise but it is totally silent.  

...got several more toolboxes for my tool corner.  a 56" and 44".  

...picked up my new pallet racking.  i will have 36 linear feet of 12 foot high pallet shelves 42' deep.  blue uprights of course.  will install this week.  

...picked up the tv's for the mancave.  hope to install all of them along with the av gear this next weekend when scott is home.  

...finished the bathroom shower.  

...installed a bathroom cabinet

....and the last two days, my neighbor and i tractor danced with our two tractors and spread 100 ton of granite.  got the driveway all sloped right.  now just have some finishing touches on it.  so far we have spread about 300 ton of rock or more.  

getting close.  

tom
Looking great Tom.
Very nice , Tom . I wish we were neighbors!!!
dean, as handy as you are, i wish we were neighbors too. (and a nice guy too)

tom
this week there has been alot of progress on the shop.  

....got the mancave aircon up and running.  i got a 18 seer variable speed air handler and variable speed outside heatpump.  very very quiet.  cant even hear the air handler running when right next to it.  i was paranoid about duct noise but it is totally silent.  

...got several more toolboxes for my tool corner.  a 56" and 44".  

...picked up my new pallet racking.  i will have 36 linear feet of 12 foot high pallet shelves 42' deep.  blue uprights of course.  will install this week.  

...picked up the tv's for the mancave.  hope to install all of them along with the av gear this next weekend when scott is home.  

...finished the bathroom shower.  

...installed a bathroom cabinet

....and the last two days, my neighbor and i tractor danced with our two tractors and spread 100 ton of granite.  got the driveway all sloped right.  now just have some finishing touches on it.  so far we have spread about 300 ton of rock or more.  

getting close.  

tom
Tom

Glad to hear your progress epically on the AC now for some hot weather to see if it will really work. Lol place is looking great.
Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49